Infrastructure Plan
Jhirandiya, Kishangarh Bas Block,
Alwar, Rajasthan
1. Resource Map
2. Village Water Commiee
3. Socio-economic & Demographic Details
4. Pictures of Johad
5. Tentave Esmates for Repairing of Johad
6. Steps Involved
1. Resource Map –
1. Resource Map of Jhirandiya –
2. Village Water Commiee –
2. Village Water Commiee –
Agenda for Village Water Commiee –
3. Socio-Economic and Demographic Details –
1. Total populaon: 971
2. Gender disaggregated populaon
- Male: 522
- Female: 449
3. Caste segregated populaon
- SC: 409
- OBC: 563
- Gen:
4. Total livestock in the village
- Cows: 10
- Bualoes: 120
- Goats: 129
5. Number of SHGs
- No. of SHGs Operaonal: 02
- No. of SHGs Non-operaonal/ dormant: No
6. List of all the crops grown in the village
- Wheat
- Mustard
- Gram (Chana)
- Onion
- Coon
- Pearl Millet (Baajra)
7. Area under green fodder: 61 hectares
8. Area under forest: 80 hectares
9. Area under agriculture: 142 hectares
10. Ground water level: 300 feet
11. Duraon of water availability of Johad (months/year): 1 year
12. No. of families will be directly beneted from the renovaon work of this johad: 80 HHs
13. No. of families will be beneted in directly from the renovaon work of this johad: 130 HHs
4. Pictures of Johad
5. Sample Esmates for Repairing of the Johad/ Pond
Sample Estimate for Repairing of the Pond (Earthen Embankment)
S.
No.
Particulars
Nos.
Length
of
section
(m)
Cross section (A1)
Cross section (A2)
Av. Cross
Sectional
Area
(A1+ A2)/2
(Sq. m.)
Quantity
Unit
Rate
(Rs/
unit)
Amount
(Rs.)
Depth/H
eight
(m)
Top
Width
(m)
Base
width
(m)
Average
Width
(m)
Cross
Section
al Area
(Sq.m.)
Depth/H
eight
(m)
Top
Width
(m)
Base
width
(m)
Ave.
Width
(m)
Cross
Sectional
Area
(Sq. m.)
1
Site clearance work, etc.
1.1
Site clearance
work, etc.
1
90
25
2250.00
sqm
4
9,000.00
2
Layout of Pond Paal
2.1
Layout of earthen
portion side base
top filling, etc.
3
90
270.00
m
4
1,080.00
3
Earthwork in old paal
3.1
Section 1
1
15.00
2.25
3.00
10.20
6.60
14.85
1.50
3.00
9.75
6.38
9.56
12.21
183.09
3.2
Section 2
1
15.00
3.96
2.50
8.75
5.63
22.28
2.60
2.50
14.20
8.35
21.71
21.99
329.89
3.3
Section 3
1
15.00
4.10
2.50
8.90
5.70
23.37
3.60
2.50
18.70
10.60
38.16
30.77
461.48
3.4
Section 4
1
15.00
3.72
1.95
9.35
5.65
21.02
4.05
1.95
20.18
11.06
44.80
32.91
493.66
3.5
Section 5
1
15.00
3.80
2.10
9.25
5.68
21.57
3.90
2.10
19.65
10.88
42.41
31.99
479.83
3.6
Section 6
1
15.00
1.60
4.65
10.66
7.66
12.25
4.55
4.65
25.13
14.89
67.74
39.99
599.90
Total
90.00
2547.84
4
Earthwork in the paal both side filling work
4.1
Section 1
1
0.00
0.00
3.50
3.50
3.50
0.00
2.15
3.50
13.18
8.34
17.93
8.96
0.00
4.2
Section 2
1
15.00
2.15
3.50
13.18
8.34
17.93
2.65
3.50
15.43
9.46
25.08
21.50
322.51
4.3
Section 3
1
15.00
2.65
3.50
15.43
9.46
25.08
3.45
3.50
19.03
11.26
38.86
31.97
479.48
4.4
Section 4
1
15.00
3.45
3.50
19.03
11.26
38.86
4.00
3.50
21.50
12.50
50.00
44.43
666.42
4.5
Section 5
1
15.00
4.00
3.50
21.50
12.50
50.00
3.65
3.50
19.93
11.71
42.75
46.38
695.63
4.6
Section 6
1
20.00
3.65
3.50
19.93
11.71
42.75
2.50
3.50
14.75
9.13
22.81
32.78
655.63
4.7
Section 7
1
20.00
2.50
3.50
14.75
9.13
22.81
2.30
3.50
13.85
8.68
19.95
21.38
427.65
Total
100.00
3247.32
Deduction for core wall earth work
2547.84
Net EW
699.48
cum
700.0
4,89,636.00
5
Murom & rubble laying on paal top and u/s surface side complete items
5.1
On paal top
1
90
0.1
3.5
3.50
3.50
31.50
cum
1080
34,020.00
5.2
On paal surface side
6
Diversion Channel and Plantation Work
6.1
Diversion Channel
1
330
1.2
2
1.00
1.50
594.00
Cum
510.0
3,02,940.00
6.2
Plantation work
30
20.00
no.
150
3,000.00
Grant Total
8,39,676.00
6. Process for actual repair/ maintenance/ rejuvenaon/ renovaon work –
Notes
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
Notes
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
Rejuvenaon work of Johad done by CSR & SPECTRA at Dhadhikar Village, Umren Block,
Alwar, Rajasthan in 2020
Photo Source: spectraalwar.org (hps://www.spectraalwar.org/natural-resource-management/)
CENTRE FOR SOCIAL RESEARCH
1
CONTACT:
Dr. Naveen Kumar I naveen@csrindia.org
DELHI
2, Nelson Mandela Road,
Vasant Kunj, New Delhi,
India – 110070
RAJASTHAN
20, Shiv Complex, Jail Circle
Behind – Cross Point Mall,
Alwar, Rajasthan - 301001
E-mail: info1@csrindia.org
Phone: +91 011 4613 1929
1
Centre for Social Research – is a non-prot organizaon based in New Delhi,
India was founded in 1983, CSR is dedicated to creang a violence-free, gender-
just society through social research, capacity building and advocacy.